Detail

Location:Home > Detail

Baoji-Chengdu Railway

Date:11-28-2018

As the first electrified railway built in China, the project started in 1952 and has a total length of approximately 668 kilometers. CREC is responsible for providing about 68% (by length) of survey and design services.

Baoji-Chengdu Railway